Why the Courier Mesh Schedules at the Hub and Not at the Centre

We rejected a single central 4D trajectory planner and gave each rooftop vertipad hub authority over its own departures, bounded by time-limited airspace leases. The main reason was partition behaviour. With a central planner, losing the link to the planner means losing the ability to dispatch. With the federated design, a hub that loses its link keeps dispatching inside the leases it already holds, and when those leases expire it stops.

The option we turned down, stated at full strength

The central planner is not a strawman. One process sees every intent, every vertipad slot and every corridor volume, so deconfliction becomes a single global optimisation and never a negotiation. That produces tighter packing at contested hubs and no duplicate claims by construction. It also gives a much simpler safety case: one component carries the high software and hardware assurance burden under airborne assurance standards such as DO-178C and DO-254, and the hubs become thin clients that are cheap to qualify. If our only concerns were throughput per corridor and certification cost, the central planner would have won.

What breaks it

The failure that settled the decision is a network partition between a hub and the planner while aircraft are already committed to approach and departure sequences. A central design has two choices in that situation. It can freeze the partitioned hub, which strands couriers that are already loaded and pushes inbound aircraft into holding with a battery margin that was never sized for indefinite holds. Or it can let the hub act on stale plans, and that brings back the duplicate corridor claims the design was supposed to rule out. Redundant links make this less likely but do not remove it, because rooftop sites share last-mile infrastructure in ways that make failures correlated.

The lease mechanism and the rule behind it

Each hub holds strategic intent leases on specific corridor volumes and time windows, with a lease duration of 120 s. It may dispatch only into volumes it holds, and a lease that is not renewed expires on the hub's own clock with no message required. A partitioned hub therefore degrades in a predictable way: it finishes what its leases cover, stops new departures, and keeps its pads open for recovery landings. The decision rule we would hand to any reviewer is this: if the coordinator's worst-case reconvergence time after a partition is longer than the lease duration, federate; if it is reliably shorter, central planning is the better trade. Our measured reconvergence across the rooftop backhaul came in above the lease duration often enough, by our estimate several times a week per metro cluster, that federation was the only answer we could defend.

The condition that would reverse this ADR is a coordinator link with a contractually bounded latency and failover time well below the lease duration, and if a future backhaul delivers that, we should go back to the central planner and recover the packing efficiency we gave up, which we estimate at a single-digit percentage of corridor throughput at the busiest hubs.

Doesn't federation just move the duplicate claim problem into lease renewal?

Only if two hubs can renew the same volume. They cannot: the coordinator is the only lease grantor and grants are exclusive. During a partition, renewal stops instead of forking, so the worst case is idle capacity until the link returns, never two aircraft holding claims on the same volume.

Back to DeliverInTheSky · Domains

← Back to DeliverInTheSky
Engineering & Architecture Brief

Why the Courier Mesh Schedules at the Hub and Not at the Centre

We rejected a single central 4D trajectory planner and gave each rooftop vertipad hub authority over its own departures, bounded by time-limited airspace leases. The main reason was partition behaviour. With a central planner, losing the link to the planner means losing the ability to dispatch. With the federated design, a hub that loses its link keeps dispatching inside the leases it already holds, and when those leases expire it stops.

The option we turned down, stated at full strength

The central planner is not a strawman. One process sees every intent, every vertipad slot and every corridor volume, so deconfliction becomes a single global optimisation and never a negotiation. That produces tighter packing at contested hubs and no duplicate claims by construction. It also gives a much simpler safety case: one component carries the high software and hardware assurance burden under airborne assurance standards such as DO-178C and DO-254, and the hubs become thin clients that are cheap to qualify. If our only concerns were throughput per corridor and certification cost, the central planner would have won.

What breaks it

The failure that settled the decision is a network partition between a hub and the planner while aircraft are already committed to approach and departure sequences. A central design has two choices in that situation. It can freeze the partitioned hub, which strands couriers that are already loaded and pushes inbound aircraft into holding with a battery margin that was never sized for indefinite holds. Or it can let the hub act on stale plans, and that brings back the duplicate corridor claims the design was supposed to rule out. Redundant links make this less likely but do not remove it, because rooftop sites share last-mile infrastructure in ways that make failures correlated.

The lease mechanism and the rule behind it

Each hub holds strategic intent leases on specific corridor volumes and time windows, with a lease duration of 120 s. It may dispatch only into volumes it holds, and a lease that is not renewed expires on the hub's own clock with no message required. A partitioned hub therefore degrades in a predictable way: it finishes what its leases cover, stops new departures, and keeps its pads open for recovery landings. The decision rule we would hand to any reviewer is this: if the coordinator's worst-case reconvergence time after a partition is longer than the lease duration, federate; if it is reliably shorter, central planning is the better trade. Our measured reconvergence across the rooftop backhaul came in above the lease duration often enough, by our estimate several times a week per metro cluster, that federation was the only answer we could defend.

The condition that would reverse this ADR is a coordinator link with a contractually bounded latency and failover time well below the lease duration, and if a future backhaul delivers that, we should go back to the central planner and recover the packing efficiency we gave up, which we estimate at a single-digit percentage of corridor throughput at the busiest hubs.

Technical FAQ: Doesn't federation just move the duplicate claim problem into lease renewal?

Only if two hubs can renew the same volume. They cannot: the coordinator is the only lease grantor and grants are exclusive. During a partition, renewal stops instead of forking, so the worst case is idle capacity until the link returns, never two aircraft holding claims on the same volume.

Related Architecture Specifications (AIRSPACEGATEWAY): rescueevtol.com · uavsync.com · airplanetwin.com

More Technical Articles on deliverinthesky.com

Structural and Fire Engineering for Rooftop Drone Vertipads: Building Codes and NFPA 418 →Integrating Drone Logistics Hubs with Enterprise Warehouse Management Systems (WMS) →Keep Landing Authority Local When the Delivery Mesh Loses Contact →